Steam Center Installation – Dortmund Clinic
A track record of delivering reliable results, every time
Project Overview
In this project, FAM Montaža was responsible for the installation of the new steam central system at Clinic Dortmund, including the assembly and welding of black steel pipes as well as the installation of a Wiesmann hot water boiler. The system was specifically optimized for the generation and distribution of steam and hot water to meet the high demands of a medical facility.


Our Services:
✔ Assembly and welding of black steel pipes for steam and hot water lines
✔ Installation of a Wiesmann hot water boiler, including all necessary connections
✔ Piping construction and connection to the clinic's existing infrastructure
✔ Radiographic testing for quality assurance of welds
✔ Pressure testing and leak checks of the entire system
✔ Commissioning and final inspection


Challenges & Solutions
Working in a Medical Facility
To minimize disruptions to the clinic's operation, the work was conducted in coordinated time slots.
High-Pressure System with Welded Joints
The black steel pipes were processed with specialized welding methods to meet high-pressure and high-temperature requirements.
Quality Assurance through Radiographic Testing
All welds were checked using radiographic imaging (RT) to ensure the highest level of safety and longevity.
Results
he project was completed on time and within the specified budget. The client particularly praised the high quality of the welding work, the precise coordination with the clinic's operations, and the efficient commissioning of the system.
Location: Dortmund, Clinic